SPACE May 2026 (No. 702)


Olympic Mode (left) and Legacy Mode after demolition ©Junglim Architecture (right)
The PyeongChang Olympic Stadium was the first project in Olympic history designed with the goal of being dismantled and recycled after the event. The temporary stands and facilities used during the games were all leased. Only the first three floors of the seven-storey headquarters building remain as a memorial hall, while the slopes that once held the stands were converted into natural terracing. The site for the opening and closing ceremonies is characterised by mou...
Junglim Architecture (Jeong Yongkyo, Lee Myungjin)
Junglim Architecture – Kang Giyeop, Ki Hyunc
220, Olympic-ro, Daegwallyeong-myeon, Pyeongchan
temporary building (olympic opening & closing cer
246,977m©÷
31,224.74m©÷
62,504.01m©÷
B1, 7F
173
38.25m
steel frame, RC
glass wool insulated panel, autoclaved cement ext
granite stone, eco-water paint on plaster board, t
Chang Minwoo Structural Consultants
Woowon M&E Inc.
NARA Engineering consultant
DL E&C Co.,Ltd.
July 2015 – Aug. 2016
Dec. 2015 – Sep. 2017
The PyeongChang Organizing Committee for the 2018
CA Landscape Design Co., Ltd.
94.046 billion KRW